12.29.2021

cabin: framing one

The framing is starting to go in! The lower floor is framed (with the 3,000 gallon rainwater tank installed). By this time, the floor is sheathed and they've started framing the upper floor. The lower floor will be stained concrete while the upper floor will be slate: 



 


 


 


 


 


 


 

 

 

 

 

 

No comments:

Post a Comment