6.23.2013

week 44: landscaping, garage door, gate, mirror, punching, details


It's been like an HGTV remodeling show with the deadline fast approaching over at the house lately. Lots going on as the builder hacks his way through the lingering items list. Let's check in, shall we?

front landscaping

...has been going fast and furious and it's looking great. The landscaper has been putting in metal edging that is just perfect (as in straight and crisp) for our modern house. They were also able to square around the trees out front, something the builder was balking at early in the process. That gravel is Texas Black, but it actually looks grey, which is fine by us.



alls the walls

They were working yesterday (Saturday) to get the footings in for the four (count em: four) neoplastic walls in the front yard. Next up will be laying the concrete block and then the stucco on top of that to match the house. May get done next week; may not.





That nub is to run power to the wall.

a feat of grasscrete

Besides the wall footings out front, they also poured a concrete edging for the grasscrete driveway (and also did a mighty fine job). That was a surprise to the budget but was needed to hold the grasscrete drive in place. We also think it will look good as well. 



Still curing...



garage door

Did you notice the final garage door in the photos above? It looks nice! It allows a nice amount of light inside and, surprisingly, keeps the garage cooler than I would of thought (think hothouse with that western exposure). 




The installer also installed the electric door opener, a belt-driven deal that doesn't look too bad:


landscaping overall

Overall, we're really happy with the landscaping. The minimalism complements the house, and the mixture of materials (done more for cost cutting than anything) works quite well and even enhances the cubism, 









inside?

There's been a lot of detail work going on inside, including touching up the drywall and the painting.



Still need some glass.

Cover for the ERV.

Not sure about this color for the posts. Meant to approach the color of the anodized aluminum. Something we may change later...


mirrors mirrors on the wall

We hung up the powder room mirror(s). Looks good!


drivegate

Primed and (nearly) ready to go.




green-tagging

The builder has been using blue painter's tape to mark where something needs to be done. We went ahead and marked stuff with green. Besides the obvious stuff, there's not much more to do! A couple examples...

Missing a bulb here...

When they siliconed the countertop to the wall, they neglected to first clean the groove. Here are two wire bits "petrified" into the groove. (sigh...)

schedule

The builder hopes to have the city inspector over mid-week to inspect for the Certificate of Occupancy. He says it's a crap shoot: How long does it take for an inspector to show, what does he find, how long it takes to address what he finds, how long does it take for him to come back and re-inspect (and does he find something else)? So we shall see. At least we're days away from having that inspection.

Drama-wise, we have to be out of our apartment July 7th, so we will be cutting it close. We haven't scheduled movers yet. Ideally we get the CoO by mid-week and schedule a move for next week. Non-ideally we plan for a July 5th move either to the house (if we get a late CoO) or (very non-ideally) to storage and get a hotel room. Talking to various friends and colleagues, it doesn't seem uncommon for this to happen, with unexpected stays in hotels ranging from two days to two months. The German blood that courses through the bride's veins doesn't appreciate the scheduling uncertainty. Her right eye has developed a persistent twitch...

overall...


...the house is looking great! The builder says this is the nicest house he's built (he prolly says that to all the girls...). He, the cabinet lady, and the architect all plan to hire photographers to come shoot the house, evidence, perhaps, they're not flattering us. The builder and cab-lady are taking photos before we move in; the architects after.

The anticipation of moving in is rather exhausting. We're looking forward to actually being in the house and then crashing on the sofa with (large) glasses of wine...

punch list

black = builder
orange = us
gray and crossed = done!
red = new item

general items:
- touch-up paint (partial; almost done)
- touch up drywall
    - various locations
    - tops of doorways
- polish/finish concrete floor
- window hardware
- clean windows
- seal sills
- door hardware
    - knobs
    - doorstops
- pocket door hardware
- wood floor
- general clean-up! (partial; almost done)

master bedroom:
- art can (partial)
- seal outside door
- outside door hardware
- plugs in bedside tables

master closet:
- light
- hanger poles (partial)

master bath:
- faucets
- toilet
- tub
- shower faucet
- tub spout
- tub faucet
- plumbing connects
- mirror
- vanity lights
- above tub light cover
- drawer plug
- cab adjusts
- switch cover in toilet room
- touch up tile trim

master hall:
- thermostat

buds and suds:
- faucet
- LEDs
- backsplash
- plug cover
- counter plug electric
- light
- cab adjusts
- drawer interference with sill (bumper on sill?)
- plumbing connects

rear entry (hee hee!):
- CO detector
- art can (partial)
- level door?
- thermostat

pantry:
- hot water control
- cable/data hookups

kitchen:
- wood for peninsula
- reinstall drawers
- back splash
- cooktop electric (partial)
- cooktop gas (partial)
- fridge
- oven/microwave
- dishwasher
- LEDs
- cab adjusts
- sink faucet
- potfiller
- seal countertop edges
- hood
- hood top cap
- plumbing connects

dining:
- art cans (partial)
- paint pillars
- crystal

living:
- speakers
- art can (partial)
- LEDs
- touch up cabs
- cab pulls
- seal upper windows to wood?
- floor plugs

entry:
- light switch covers
- door bell chime
- door knob
- door bell working

coat closet:
- pole

powder:
- sink
- light
- mirror
- toilet
- toilet buttons
- plumbing connects
- toilet stability

office: (done!)

stairwell:
- missing plug?
- treads
- hand rail (partial)

romeo landing and hall:
- railing (partial)
- floor plug
- thermostat
- gas to furnace
- ceiling switch covers
- cans
- pendant lights (partial)
- switch cover

guest bed:
- closet pole
- closet doors
- closet door hardware

guest bath:
- faucet
- plumbing connects
- mirror
- light
- tub faucet
- can light
- shower rod
- toilet

work out room:
- ERV cover
- closet bars (partial)
- light
- closet light

garage:
- garage door
- entry door paint?
- entry door hardware
- garage door opener
- stain floor?
- switch cover
- lights
- faucet
- back light

outside:
- faucet by master
- plug by master
- cable
- plug by condenser
- water heater
- wiring to stage  (partial)
- wiring to hot tub  (partial)
- gutters
- gas meter
- gas connection
- finish out sewer clean-out under cantilever
- wire to outdoor light on front wall (partial)
- window bottom trim at front
- window bottom trim at back
- entry plug
- doorbell
- seal limestone to door at front entry
- roof over limestone/bookshelf bump-out
- carport faucet
- paint eyebrows (partial)
- seal to cypress?
- clean roof
- holes for outside speakers
- install outside speakers
- house numbers
- mailbox

landscaping:
- north side fence Sol
- north side fancy fence (partial)
- gate (partial)
- south side fence Sol
- south side fancy fence (partial)
- rear fence (partial)
- white gravel in back
- mulch in back
- pavers
- grasscrete
- plant grass in grasscrete
- black gravel in back (partial)
- black gravel in front (partial)
- mulch in front (partial)
- feather grass
- trees in front
- trees in patio (partial)
- tree on south side
- front walls (partial)
- horno base
- place horno



stuff we'll address later on our own:
- built-in shelves in the master bath
- gate beside the garage and property line (to hide trash)
- built-in shelves in the guest bath
- built-in desktop in the guest bedroom
- in-shelf shelves in the kitchen
- cat door
- stage
- planters
- garden
- shorter drop pole for the ceiling fan in the office
- upgrade plugs and switches
- upgrade outdoor plug covers
- upgrade outdoor spigots
- cabinets in pantry
- glass shelves for buds-n-suds
- wood for shelf in living room window
- plug cover for living room
- front agaves
- hedges
- rainwater tank
- solar
- wine fridge
- window treatments
- security
- clothes line

5.27.2013

week 40: schedule, gas, fence, power pole, backsplash, rails, horno



the white house

The sweetheart down the street (she's 93) told me the other day that she and the neighbors refer to our house as "The White House". I guess that makes sense since the house is (ahem) rather white. Bright white, actually. She says she brags to her friends that she knows someone in the white house.

One challenge of taking photos in the house (as you know, it's mostly white on the inside as well) is that sometimes (about 25 percent of the time) I can't get the camera to auto focus, so I have to go rogue (manual), at which point I see why the auto focus has a heck of a time because I have a heck of a time as well. Everything blurs together into infinity. It's rather calming...

the schedule

Not posting a schedule anymore because the schedule is, sadly, a bit uncertain at the moment. That's a bit miffing, especially since we put in our two months notice to vacate on our rental a couple weeks ago based on a recently determined June 7th completion date. Then a week ago we went from "June 7th" to "maybe the end of June". Maybe? The builder says he'll have a better idea after this week. One issue is that it takes up to five days to get an inspection once you put in for one. I noted that there has to be something to inspect before an inspection can occur, and we're not there yet.

We're on the street after July 7th...

we've got gas

And not just from eating at the Texas Chili Parlor. We missed getting a photo of the big hole to connect our gas line to the street. Still not connected to the house yet...


rear fence

The rear fence is partially up, and it looks pretty darn good. Really complements the rest of the place.



power pole

I don't know if it was my pep talk or not, but the electricians finally started finishing the electric.  I think part of the delay was the light guy not putting in our order for lights, so they are arriving later than they should (and somewhat randomly). About a month ago he sent us a note that the light for the pantry was back ordered until late June. We said "That ain't gonna work. What's an alternative?" and was greeted with dead silence. After a week of no response, I bought a light at IKEA and sent him a note to cancel the light order for the pantry, to which he responded "No can do: That light was special ordered and it's now in-house." Thanks for letting me know, buddy...

So for the lights still missing, the electricians have either put in placeholders or blank plates so they can get the go-ahead from the city to turn the power on.

The curly-Q is a holder for a directional art light in the master:



Here's one of the several plates in the house (behind which are wires stubbed off with wire connectors) waiting for final light fixtures to arrive.


Here's the power pole at the garage:


There are three circuit boxes on the property: the one above on the garage, the one outside the house where the wires come out of the ground, and the one in the pantry. That's a lot of boxes!

Here's the doorbell chime (this is one of those all-white photos where it was hard to focus...):


And outside is the doorbell:


And there it is on the approach:


The architects originally had it centered under the window, but that wasn't going to work with the in-wall toilet in that wall under that window. Ditto on the plug. Aesthetically, that would have been better, but here we are...

Here's the CO detector:


And here's the lights in the garage (in battle formation):


Yea-haw! The house looks ready for the "soft electrical" permit, although the floor plugs aren't stubbed off. Not sure if they forgot or are coming back. We shall see...

jumpin' jack backsplash (it's a gas, gas, gas!)

The backsplashes are in, and they look grand!






railing against the world

The beginnings of the railing upstairs has gone in:





horno arrival

The horno arrived, and we are glad to have a horno at the house. A house is not a house without a horno at it. Hornos are warm, cuddly, and ours has a blue plug in its rear. Sweet! Horno love!


Another photo of that shower drain


a visitor...


punch list

There is still a lot to do...

black = builder
orange = us
gray and crossed = done!

master bedroom:
- art can (partial)
- seal outside door
- outside door hardware
- plugs in bedside tables
- the standards:
   - touch-up paint
   - polish floor
   - clean windows
   - seal sills
   - door hardware
      - knob
      - doorstop

master closet:
- light
- hanger poles (partial)
- the standards:
   - touch-up paint
   - polish floor
   - clean windows
   - seal sill
   - door hardware

master bath:
- faucets
- toilet
- tub
- shower faucets
- tub spout
- tub faucet
- mirror
- vanity lights
- above tub light cover
- drawer plug
- drawer adjusts
- switch cover in toilet room
- touch up tile trim
- the standards:
   - touch-up paint
   - polish floor
   - clean windows
   - seal sill
   - door hardware
      - knob
      - doorstop
   - pocket door hardware

master hall:
- thermostat
- the standards:
   - touch-up paint
   - polish floor
   - door hardware
      - knob
      - doorstop

buds and suds:
- faucet
- LED lights
- backsplash
- plug cover
- counter plug electric
- light
- cab adjusts
- the standards:
   - touch-up paint
   - polish floor
   - clean windows
   - seal sill
   - pocket door hardware

rear entry (hee hee!):
- CO detector
- art can (partial)
- level door
- thermostat
- the standards:
   - touch-up paint
   - polish floor
   - clean windows
   - door hardware
      - knob
      - doorstop

pantry:
- hot water control
- cable/data hookups
- the standards:
   - touch-up paint
   - polish floor
   - door hardware
      - knob
      - doorstop

kitchen:
- peninsula wood
- back splash
- cooktop electric
- cooktop gas
- fridge
- oven/microwave
- dishwasher
- LEDs
- cab adjusts
- sink faucet
- potfiller
- seal countertop edges
- hood
- hood top cap
- the standards:
   - touch-up paint
   - polish floor
   - clean windows
   - seal sills

dining:
- art cans (partial)
- paint pillars
- the standards:
   - touch-up paint
   - polish floor
- crystal

living:
- speakers
- art can (partial)
- LEDs
- touch up cabs
- cab pulls
- seal upper windows to wood?
- floor plugs
- the standards:
   - touch-up paint
   - polish floor
   - clean windows
   - seal sills

entry:
- light switch covers
- door bell chime
- door knob
- the standards:
   - touch-up paint
   - polish floor
   - clean windows

coat closet:
- pole
- door hardware
      - knob
      - doorstop
- the standards:
   - touch-up paint
   - polish floor

powder:
- sink
- light
- mirror
- toilet
- door hardware
      - knob
      - doorstop
- toilet button
- the standards:
   - touch-up paint
   - polish floor
   - clean window
   - seal sill

office:
- door hardware
      - knob
      - doorstop
- the standards:
   - touch-up paint
   - polish floor
   - clean windows
   - seal sills

stairwell:
- missing plug
- treads
- hand rail
- the standards:
   - touch-up paint
   - clean windows

romeo landing and hall:
- railing (partial)
- floor plug
- thermostat
- gas to furnace
- ceiling switch covers
- cans
- pendant lights
- door hardware for utility closet
- switch cover
- the standards:
   - touch-up paint
   - install wood floor
   - clean windows
   - seal sills

guest bed:
- closet pole
- closet doors
- door hardware
      - knob
      - doorstop
- closet door hardware
- the standards:
   - touch-up paint
   - install wood floor
   - clean windows
   - seal sills

guest bath:
- faucet
- mirror
- light
- tub faucet
- can light
- shower rod
- toilet
- door hardware
      - knob
      - doorstop
- the standards:
   - touch-up paint
   - clean windows

work out room:
- door hardware
      - knob
      - doorstop
- ERV cover?
- closet bars
- light
- closet light
- the standards:
   - touch-up paint
   - install wood floor
   - clean windows
   - seal sills

garage:
- garage door
- entry door
- entry door hardware
- garage door opener
- stain floor
- switch cover
- lights
- faucet
- back light

outside:
- faucet by master
- plug by master
- cable
- plug by condenser
- water heater
- gutters
- gas meter
- gas connection
- clean up clean out
- wire to outdoor light
- window bottom at front
- window bottom at back
- entry plug
- doorbell
- seal limestone to door
- roof over limestone
- carport faucet
- paint eyebrows
- seal to cypress?
- clean roof

landscaping:
- north side fence Sol
- north side fence fancy
- gate side fence
- gate
- south side fence Sol
- south side fence fancy
- rear fence
- white gravel in back
- mulch in back
- pavers
- grasscrete
- black gravel in back
- black gravel in front
- mulch in front
- feather grass
- trees in front
- trees in patio
- tree on south side