6.23.2013

week 44: landscaping, garage door, gate, mirror, punching, details


It's been like an HGTV remodeling show with the deadline fast approaching over at the house lately. Lots going on as the builder hacks his way through the lingering items list. Let's check in, shall we?

front landscaping

...has been going fast and furious and it's looking great. The landscaper has been putting in metal edging that is just perfect (as in straight and crisp) for our modern house. They were also able to square around the trees out front, something the builder was balking at early in the process. That gravel is Texas Black, but it actually looks grey, which is fine by us.



alls the walls

They were working yesterday (Saturday) to get the footings in for the four (count em: four) neoplastic walls in the front yard. Next up will be laying the concrete block and then the stucco on top of that to match the house. May get done next week; may not.





That nub is to run power to the wall.

a feat of grasscrete

Besides the wall footings out front, they also poured a concrete edging for the grasscrete driveway (and also did a mighty fine job). That was a surprise to the budget but was needed to hold the grasscrete drive in place. We also think it will look good as well. 



Still curing...



garage door

Did you notice the final garage door in the photos above? It looks nice! It allows a nice amount of light inside and, surprisingly, keeps the garage cooler than I would of thought (think hothouse with that western exposure). 




The installer also installed the electric door opener, a belt-driven deal that doesn't look too bad:


landscaping overall

Overall, we're really happy with the landscaping. The minimalism complements the house, and the mixture of materials (done more for cost cutting than anything) works quite well and even enhances the cubism, 









inside?

There's been a lot of detail work going on inside, including touching up the drywall and the painting.



Still need some glass.

Cover for the ERV.

Not sure about this color for the posts. Meant to approach the color of the anodized aluminum. Something we may change later...


mirrors mirrors on the wall

We hung up the powder room mirror(s). Looks good!


drivegate

Primed and (nearly) ready to go.




green-tagging

The builder has been using blue painter's tape to mark where something needs to be done. We went ahead and marked stuff with green. Besides the obvious stuff, there's not much more to do! A couple examples...

Missing a bulb here...

When they siliconed the countertop to the wall, they neglected to first clean the groove. Here are two wire bits "petrified" into the groove. (sigh...)

schedule

The builder hopes to have the city inspector over mid-week to inspect for the Certificate of Occupancy. He says it's a crap shoot: How long does it take for an inspector to show, what does he find, how long it takes to address what he finds, how long does it take for him to come back and re-inspect (and does he find something else)? So we shall see. At least we're days away from having that inspection.

Drama-wise, we have to be out of our apartment July 7th, so we will be cutting it close. We haven't scheduled movers yet. Ideally we get the CoO by mid-week and schedule a move for next week. Non-ideally we plan for a July 5th move either to the house (if we get a late CoO) or (very non-ideally) to storage and get a hotel room. Talking to various friends and colleagues, it doesn't seem uncommon for this to happen, with unexpected stays in hotels ranging from two days to two months. The German blood that courses through the bride's veins doesn't appreciate the scheduling uncertainty. Her right eye has developed a persistent twitch...

overall...


...the house is looking great! The builder says this is the nicest house he's built (he prolly says that to all the girls...). He, the cabinet lady, and the architect all plan to hire photographers to come shoot the house, evidence, perhaps, they're not flattering us. The builder and cab-lady are taking photos before we move in; the architects after.

The anticipation of moving in is rather exhausting. We're looking forward to actually being in the house and then crashing on the sofa with (large) glasses of wine...

punch list

black = builder
orange = us
gray and crossed = done!
red = new item

general items:
- touch-up paint (partial; almost done)
- touch up drywall
    - various locations
    - tops of doorways
- polish/finish concrete floor
- window hardware
- clean windows
- seal sills
- door hardware
    - knobs
    - doorstops
- pocket door hardware
- wood floor
- general clean-up! (partial; almost done)

master bedroom:
- art can (partial)
- seal outside door
- outside door hardware
- plugs in bedside tables

master closet:
- light
- hanger poles (partial)

master bath:
- faucets
- toilet
- tub
- shower faucet
- tub spout
- tub faucet
- plumbing connects
- mirror
- vanity lights
- above tub light cover
- drawer plug
- cab adjusts
- switch cover in toilet room
- touch up tile trim

master hall:
- thermostat

buds and suds:
- faucet
- LEDs
- backsplash
- plug cover
- counter plug electric
- light
- cab adjusts
- drawer interference with sill (bumper on sill?)
- plumbing connects

rear entry (hee hee!):
- CO detector
- art can (partial)
- level door?
- thermostat

pantry:
- hot water control
- cable/data hookups

kitchen:
- wood for peninsula
- reinstall drawers
- back splash
- cooktop electric (partial)
- cooktop gas (partial)
- fridge
- oven/microwave
- dishwasher
- LEDs
- cab adjusts
- sink faucet
- potfiller
- seal countertop edges
- hood
- hood top cap
- plumbing connects

dining:
- art cans (partial)
- paint pillars
- crystal

living:
- speakers
- art can (partial)
- LEDs
- touch up cabs
- cab pulls
- seal upper windows to wood?
- floor plugs

entry:
- light switch covers
- door bell chime
- door knob
- door bell working

coat closet:
- pole

powder:
- sink
- light
- mirror
- toilet
- toilet buttons
- plumbing connects
- toilet stability

office: (done!)

stairwell:
- missing plug?
- treads
- hand rail (partial)

romeo landing and hall:
- railing (partial)
- floor plug
- thermostat
- gas to furnace
- ceiling switch covers
- cans
- pendant lights (partial)
- switch cover

guest bed:
- closet pole
- closet doors
- closet door hardware

guest bath:
- faucet
- plumbing connects
- mirror
- light
- tub faucet
- can light
- shower rod
- toilet

work out room:
- ERV cover
- closet bars (partial)
- light
- closet light

garage:
- garage door
- entry door paint?
- entry door hardware
- garage door opener
- stain floor?
- switch cover
- lights
- faucet
- back light

outside:
- faucet by master
- plug by master
- cable
- plug by condenser
- water heater
- wiring to stage  (partial)
- wiring to hot tub  (partial)
- gutters
- gas meter
- gas connection
- finish out sewer clean-out under cantilever
- wire to outdoor light on front wall (partial)
- window bottom trim at front
- window bottom trim at back
- entry plug
- doorbell
- seal limestone to door at front entry
- roof over limestone/bookshelf bump-out
- carport faucet
- paint eyebrows (partial)
- seal to cypress?
- clean roof
- holes for outside speakers
- install outside speakers
- house numbers
- mailbox

landscaping:
- north side fence Sol
- north side fancy fence (partial)
- gate (partial)
- south side fence Sol
- south side fancy fence (partial)
- rear fence (partial)
- white gravel in back
- mulch in back
- pavers
- grasscrete
- plant grass in grasscrete
- black gravel in back (partial)
- black gravel in front (partial)
- mulch in front (partial)
- feather grass
- trees in front
- trees in patio (partial)
- tree on south side
- front walls (partial)
- horno base
- place horno



stuff we'll address later on our own:
- built-in shelves in the master bath
- gate beside the garage and property line (to hide trash)
- built-in shelves in the guest bath
- built-in desktop in the guest bedroom
- in-shelf shelves in the kitchen
- cat door
- stage
- planters
- garden
- shorter drop pole for the ceiling fan in the office
- upgrade plugs and switches
- upgrade outdoor plug covers
- upgrade outdoor spigots
- cabinets in pantry
- glass shelves for buds-n-suds
- wood for shelf in living room window
- plug cover for living room
- front agaves
- hedges
- rainwater tank
- solar
- wine fridge
- window treatments
- security
- clothes line

6.17.2013

week 43: landscaping, plumbing fixtures, appliances, doorware, clean windows, wood stairs, gate, hot water, clean-up, loan


Lots happened over the past week as the builder and his crews worked to finish the house. Still unclear when the finish date will be, but it's getting closer every day. The builder won't commit to a solid date (frustrating...), but we reckon it's because he doesn't actually know: There are still a few things to work out, Murphy's Law is prevalent, and who knows what luck we'll have in getting a timely inspector for the certificate of occupancy.

landscaping is scaping...

Lots of progress on the pavers. It's slow going (they're still working on 'em...), but they're looking real good:



The guy laying these pavers is a little unclear on random...

Cutting up a brick. It drives the bride crazy to see folks not wearing eye protection...

The grass is in the grassy knoll:


We'll need to be out there every evening making sure it gets watered until it settles in.

The horno base has been poured and the horno is placed:


That horno looks rather epic in the distance, like something out of Egypt...

The bride is already making plans to cook a chicken in there this weekend!

Some of the mulch and gravel has been placed in the back-back yard, including beside the garage:


And here's the Texas black (which is a bit gray with dust at the moment...):


Here's the grasscrete with my foot for scale. The builder said it originally got delivered to some dude up in Dallas. Had to get reshipped here.


They have the rock and sand base laid for the driveway, so they should be setting this stuff soon.

plumb happy about the plumbing

A goat herd of plumbing fixtures got installed over the past week (all except the tub):

The robot arm for the kitchen sink.

The potfiller.

That expensive (for) IKEA faucet in the laundry (buds-n-suds) room.

One of the faucets in the master bathroom.

Powder room.

The tub in the master, not yet placed.

The toilet in the master (with beautiful dual-flush buttons on top).



The master shower fixtures.

The tub spout (in the ceiling...) for the master.

Faucet in the guest bathroom upstairs.

Tub fixtures.

The sink and faucet in the powder room.

The toilet and flusher in the powder.

appliance reliance

Many of the appliances are now installed.

The Bosch dishwasher, which is not the one we ordered (wanted one with none of the controls showing). Apparently the one we picked out is no longer available, so the appliance provider chose a comparable model (without talking to us...). We think it's actually OK, but will check to make sure it's not a downgrade...

The Whirlpool fridge in the mythic "White Ice" color, which is really just a shinier white without all the texture low-rent white appliances tend to have. It works! and is already producing ice cubes. The color of it and the dishwasher (and the range hood) go well together (something I was worried about...) and with the cabinets.

The hood is now installed (yay!).

It sticks out a wee bit from the wall, but it matches the size of our goofy three-burner cooktop. We're visiting with the cabinet lady tomorrow to discuss exactly what we want to do to cover up the tubing at the top. Something asymmetric methinks...

Yes, it has a light.


doorware

Getting some doorknobs:


clean and clear windows

All the stickers and stuff on the windows are off, so we can see clear through. Nice! The large window in the living room is particularly dramatic.


Out the master bath.

Out the upstairs Romeo-et-Juliet landing.

Out the guest bath.

Corner of the bedroom upstairs.

Another upstairs bedroom window.

Yet another.



Out the kitchen window.


wood on the stairs

The wood floor upstairs on the stairs is all done.


gate posts

Steel posts for the gate are in:



in hot water

And the hot water heater is hooked up. No gas yet (my understanding is that the city will only allow either gas or electric on at a house under construction to prevent folks from moving in before a certificate of occupancy is issued).



clean-up crew

The builder had a crew in the house cleaning it. They made two passes. Stocking feet in the house here on out... The floor is supposed to be polished this week.




leaning out of the loan

Here's another advantage to going with a single-close loan: No worries on scheduling a closing date for final financing with all the uncertainty concerning when the house will be finished. Stopped in to talk to  the banker today, and he said "Move in when you can. You don't need to tell us or get our approval." There will be some paperwork to close-out the construction pay out (and make sure the builder has paid all the subs and there are no liens on the property).

It's a relief to not have to worry about scheduling a closing while at the same time trying to figure out when we can move in. Yikes!


punch list

black = builder
orange = us
gray and crossed = done!

general items:
- touch-up paint
- touch up drywall
    - various locations
    - tops of doorways
- polish/finish concrete floor
- clean windows
- seal sills
- door hardware
    - knobs (partial)
    - doorstops  (partial)
- pocket door hardware
- wood floor
- general clean-up! (partial)

master bedroom:
- art can (partial)
- seal outside door
- outside door hardware
- plugs in bedside tables

master closet:
- light
- hanger poles (partial)

master bath:
- faucets
- toilet
- tub (partial)
- shower faucet
- tub spout
- tub faucet
- plumbing connects
- mirror
- vanity lights
- above tub light cover
- drawer plug
- cab adjusts
- switch cover in toilet room
- touch up tile trim

master hall:
- thermostat

buds and suds:
- faucet
- LEDs
- backsplash
- plug cover
- counter plug electric
- light
- cab adjusts
- drawer interference with sill (bumper on sill?)
- plumbing connects

rear entry (hee hee!):
- CO detector
- art can (partial)
- level door?
- thermostat

pantry:
- hot water control
- cable/data hookups

kitchen:
- wood for peninsula
- reinstall drawers
- back splash (partial)
- cooktop electric (partial)
- cooktop gas (partial)
- fridge
- oven/microwave
- dishwasher
- LEDs
- cab adjusts
- sink faucet
- potfiller
- seal countertop edges
- hood
- hood top cap
- plumbing connects

dining:
- art cans (partial)
- paint pillars
- crystal

living:
- speakers
- art can (partial)
- LEDs
- touch up cabs
- cab pulls
- seal upper windows to wood?
- floor plugs

entry:
- light switch covers
- door bell chime
- door knob
- door bell working

coat closet:
- pole

powder:
- sink
- light
- mirror
- toilet
- toilet buttons
- plumbing connects

office: (done!)

stairwell:
- missing plug?
- treads
- hand rail (partial)

romeo landing and hall:
- railing (partial)
- floor plug
- thermostat
- gas to furnace
- ceiling switch covers
- cans
- pendant lights (partial)
- switch cover

guest bed:
- closet pole
- closet doors
- closet door hardware

guest bath:
- faucet
- plumbing connects
- mirror
- light
- tub faucet
- can light
- shower rod
- toilet

work out room:
- ERV cover
- closet bars (partial)
- light
- closet light

garage:
- garage door
- entry door paint?
- entry door hardware
- garage door opener
- stain floor?
- switch cover
- lights
- faucet
- back light

outside:
- faucet by master
- plug by master
- cable
- plug by condenser
- water heater
- wiring to stage  (partial)
- wiring to hot tub  (partial)
- gutters
- gas meter
- gas connection
- finish out sewer clean-out under cantilever
- wire to outdoor light on front wall (partial)
- window bottom trim at front
- window bottom trim at back
- entry plug
- doorbell
- seal limestone to door at front entry
- roof over limestone/bookshelf bump-out
- carport faucet
- paint eyebrows (partial)
- seal to cypress?
- clean roof
- holes for outside speakers
- install outside speakers
- house numbers
- mailbox

landscaping:
- north side fence Sol
- north side fancy fence (partial)
- gate (partial)
- south side fence Sol
- south side fancy fence (partial)
- rear fence (partial)
- white gravel in back  (partial)
- mulch in back (partial)
- pavers (partial)
- grasscrete (partial)
- black gravel in back (partial)
- black gravel in front (partial)
- mulch in front
- feather grass
- trees in front
- trees in patio
- tree on south side
- front walls
- horno base
- place horno



stuff we'll address later on our own:
- built-in shelves in the master bath
- gate beside the garage and property line (to hide trash)
- built-in shelves in the guest bath
- built-in desktop in the guest bedroom
- in-shelf shelves in the kitchen
- cat door
- stage
- planters
- garden
- shorter drop pole for the ceiling fan in the office
- upgrade plugs and switches
- upgrade outdoor plug covers
- upgrade outdoor spigots
- cabinets in pantry
- glass shelves for buds-n-suds
- wood for shelf in living room window
- plug cover for living room
- front agaves
- hedges
- rainwater tank
- solar
- wine fridge
- window treatments
- security
- clothes line