week 23: punching and sealing

Not a lot happened over the past week except continued punching out of the MEP (mechanical-electrical-plumbing) and a start to the sealing, a pre-cursor to insulation. The architect and builder had a hoe-down at the house over trim, and work continues on landscape planning (subject of a later post).

hunching and punching

The electrical, mechanical, and framing subs have been out to the house to iron out the last few details before insulation goes in and drywall goes up. The changes at the house are subtle ("Wait a minute: That wasn't here last week!"), but they are there. In preparation for the insulation, we did a little vacuuming and blowing in the outer walls to clean 'em up. Not convinced the sub would do that...

That can to the back got installed. It's to light up art on the wall in the master bedroom. 

Finally got the third thermostat installed!

The city inspectors wanted a header over this opening to the ERV (energy recovery ventilator). They got it. 

Three of these were added by the HVAC sub. They will provide access to the zone controllers.

Also done, but not shown, is the addition of a 240 line to the garage for a future electric car (part of the original bid set but not installed until now [glad I noticed that last weekend!]) and a finish-out of the roof penetration in the laundry. There are still a few punch-outs to address, but we're down to the dregs. Even the Columbo "Just one more thing..." syndrome has dried up. 

sealing

The insulation sub has been on-site and has started sealing around windows, in corners and seams, and in penetrations. In large part it's to seal the house from air penetration, but it's also to delay the spread of fire in the house if there's ever (let's hope not) a fire.

Foam and Fill Fireblock

Filled in the header holes for the old location of the electrical service.

Filling between the boards (guess the ladder wasn't tall enough?)

Foam sculpture. Looks like Circus Peanuts. Doesn't taste like Circus Peanuts.

fit and trim

The builder and sub haven't done trim with the look we want to achieve, so this is fraught with danger for all involved. Ideally, this is what we're looking for:


This detail, at least how it's done by Build LLC, involves first installing z-metal that holds the drywall, then installing the drywall, and then installing the baseboard. The builder is concerned that this allows little to no room for error and that the risk of having a gap of varying height is high (and that would not be good). There are also cost considerations. That z-metal is 'spensive. Although we have a healthy line budget to deal with this detail, it still may not be enough.

After hearing the builder's concerns, the architect has proposed that the baseboard be installed first but with a quarter-inch notch cut at the very top of the board (see below). Then the drywall would be installed to set on top of the board. The builder seems happier with this bottom-up approach, so he and the sub are going to install a mock-up to see how it works and looks. It won't be as deep of a reveal as shown above (3/8 inches tall, half an inch deep), but it will still be a single plane detail that perhaps looks even more refined.

Looking forward to checking out the mock-up.

Accidentally drawn to scale.




1.24.2013

the lot two lots down

Two lots to the north of us, a developer bought the house, scraped it, and is now starting construction (foundation forms just went in over the past week). Several have wondered if our house would inspire them to build modern. The answer is emphatically "Nope." It is, however, a custom house rather than a catalog pick. Not sure what the stye is, but it evokes Craftsman (perhaps the Green House around the corner inspired them!).

Our neighbors to the immediate north are now sandwiched between two construction zones. Yikes!

front

back

southside (the side we will see)


northside

1.21.2013

white is white, right?

Choosing colors from the swath of swatches we picked up on Saturday... Turned out to not be as hard as we thought (at least for these test colors). The hardest thing was choosing the exact flavor of (the real) white we wanted.

That reminds me of a post about architects and color by Jody Brown, he of Coffee with an Architect fame (and a frequent contributor at Houzz):




Ha! And those are only the first three of nine total (and you gotta love the comments from the clueless: "These all look the same. Am I missing something?").

As it turns out, in decorator-space (and architect-space), there are indeed different shades of white. The scientist in me says that white is white (white is light that contains all wavelengths of the visible spectrum). However, with some other colors barely mixed in (some other frequencies being absorbed), white can take on different character (warm, cool, not as glaring).

Sherman Williams, paint provider of choice of our builder, provides these tiles in their "white" collection:


I don't know about you, but the vast majority of those don't look white. In fact, none of them do! Here are some of the actual names (with snarky comments [i.e., value] added):
  • High Reflectance White (in other words, white [although it doesn't say "Total Reflectance" {and it's not as white as the border backdrop}])
  • Extra White (when just plain white is not enough)
  • Ceiling Bright White (when you need a white for your ceiling)
  • Pure White (looks a little green to me...)
  • Zurich White (as pure as the Swiss)
  • Windfresh White (got a bit of Amarillo dust storm in there...)
  • Snowbound (who pee'd in the snow?)
  • Elder White (slightly coffee stained)
  • Origami White (a wee bit pulpy)
  • White Heron (before hunting season)
  • Toque White (a good white if you are a chef and don't want to be seen...)
  • Heron Plume (before the Gulf oil spill)
  • Moderne White (oddly Arte)
  • First Star (the color of the mother of all hydrogen explosions)
  • Marshmellow (uns'mored)
  • Modest White (when you don't want the neighbors talking)
  • Reliable White (because the others aren't)
  • Bauhaus Buff (would cause Gropius to vomit a rainbow)
  • Steamed Milk (someone forgot to clean the steamer last week...)
  • Polar Bear (was there an oil spill in the Artic Ocean I missed?)
  • Restful White (the last white you'll ever see...)
The whites go on and on. Here, here, and here are some guidance on choosing the perfect white. There are indeed some things to think about. Pure absolute white can be overbearing. Having grown up in northern Illinois, I know about snow blindness. Sometimes white is indeed too white. With all the aluminum and concrete in the house, we need something more along the lines of a "cool" white, a white with a hint of blue or gray.

So, the colors we have chosen at this point:

White for the outside of the house: Extra White SW 7006  (R: 239 G: 240 B: 236)
      http://www.sherwin-williams.com/search/?siteSection=homeowners&Ntt=7006

This is the basic white which (we hope) has a hint of cool in it. On our computer, it looks gray-gray-gray, but the chip is white (no, really!). 

Color for the southwest volume and faschias: Ice Cube SW 6252 (R: 227 G: 228 B: 226)

     http://www.sherwin-williams.com/search/?siteSection=homeowners&Ntt=6252

This is a color (gray) we chose to be close to aluminum. 

For the Hardie board volumes: Olympus White SW 6253 (R: 213 G: 216 B: 216)

     http://www.sherwin-williams.com/search/?siteSection=homeowners&Ntt=6253

I get a chuckle out of the name since this is a darker gray than the aforementioned Ice Cube, yet it is called white.

For the non-wooded soffits: Sky High SW 6504 (R: 221 G: 231 B: 233)

    http://www.sherwin-williams.com/search/?siteSection=homeowners&Ntt=6504

A wee bit of the vernacular in here (light light blue is traditional for porch ceilings) and an homage to the original intent of having an icehaus (Ice Cube helps too!).

Interior color:
    Extra White SW 7006 
(R: 239 G: 240 B: 236)

Same as the above for the exterior white to keep that inside-outside she-bang going.

Looking at the RGB formula (a color formula that mixes amounts of Red Green Blue), I noticed the following:

  • When the numbers are exactly equal to each other, you have true gray.
  • As the numbers get smaller, the colors get darker. In other words, the smaller the number, the greater amount of that color.
  • Given that, based purely on RGBs, Extra White is lighter than Ice Cube is lighter than Olympus White.
  • Extra White has a slight emphasis on red and green, so there's a hint of purple in there (just a hint!).
  • Ice Cube also has a slight (very slight) emphasis on red green.
  • Olympus White has a slight emphasis on blue and green, and Sky High has a stronger emphasis on blue and green (hence the sky blue color).

If you click on the links above, you might be appalled. The colors on my computer screen look mucho diferente than the colors on the chips. Here are some photos that better catch the colors, but it's still hard to capture them for internet viewing.


Yep, that dark gray is called "Olympus White". Pollution combined with marble??? Facade limestone for the backdrop.

Slightly different light.


And here's where they would go and what they would (kinda) look like on the house:











The builder will throw some up for us to see, hopefully this week!

1.20.2013

week 22: stucco done (and more fun to come)!


Big stuff on the outside, details on the inside. It's week 22!

stucco done!

The last coat of stucco is complete, and it looks great! We didn't go with baby-butt smooth stucco (= mucho bucks), but the level of smoothness we went with (teenager-butt smooth) looks pretty slick. The quality of the framing is shining through right now: sooper-dooper flat! We don't see anything that makes us go "hmmmm...."

The house at this point looks very New Mexico-y to us (we've both lived in the Land of Enchantment in the deep dark past), which is not a bad thing. Paint will likely bring the house from the Earth to the machine aesthetic.

Seeing the house with the stucco complete makes it more "real". The outside is nearly complete! Whoop! Whoop!

stucco about the powder pooper window

a corner of completed stucco

the cantilevered wall next to the (soon-to-be) limestone wall

back outside wall of the master bedroom; those lines are expansion joints

stucco "slag" (the loose stuff that sluffs down the wall when they apply the stucco) about the base of the cantilevered wall.

the back of the house (master suite)

stucco on the cantilevered wall with the reveal at the window




paint?

Now we need to choose paint colors, and pronto! The builder uses Sherman Williams, so we stopped by there yesterday to pick up chips and whatnot. After we choose some colors, the builder will throw up paint so we can see what it looks like. That will be helpful (and buys us more time before making a final decision).

look toward the left, not the right...

limestone

The builder had a chunk of limestone onsite this past week, and it's on the money: Texas Cream. The final pieces will be somewhat sizable, about half the width of the windows above.






cabinets

After a meeting that included two bowls of queso and three margaritas, we finally finalized the cabinet order. I reckon the cabs will go in right after the drywall goes up, so they will be coming soon!


Nope: Our bed won't be in the dining room. Nice try, Cabinet Lady, nice try...

final (we hope) "we wiring"

Due to finishing details on the electrical and responding to inspection deficiencies on the electrical, plumbing, mechanical, and framing (they always find them, I am told), our project is now about 30 days behind schedule. The builder is apologetic, but we've appreciated the extra time to contemplate and install speaker wire and network cables. We were back out there yesterday to run network cable for wifi stations (one in the hallway between the kitchen and dining, one in the back of master bedroom, and one upstairs). We also ran an extra network cable to the TV area in the living room. TVs are getting smarter, so I can see direct network connections coming soon (if not already). Another network cable might allow us to keep the cable box in the pantry and control it remotely (and allow us to serve the telly signal about the house). We also ran network cable in the garage for a couple video cameras.

In all, we ran cable for all the speakers in the house and the garage, network cameras for video cameras, network cables for glass break detectors, and network cable for wifi stations. Including what the electrician's ran for network cables and cable cable, we have 34 returns to the pantry. Not a lot in the grand scheme of things (I've seen insane photos on the interwebs), but a fair amount nonetheless. I think this is all we will do.

the bundle on the right is theirs, the bundle on the left is ours

wood for ceiling and soffit

We had decided on cedar, and then undecided, and then decided on pine, and now have undecided on that. And now there's a new wood in the mix: cypress. We would absolutely love cypress. We saw it on the house below during a home tour, and gasped with joy. The builder says he now has a good source for cypress and will check in on price. Cypress or cedar, that is the question...


this photo from here


landscaping

With the exterior nearly complete, here come the serious discussions on landscaping.  We have a fairly healthy budget for landscaping, but at the same time, we don't think it will cover everything (it's an allowance at this point). First things first, we need to have a master plan for everything. It's always good to have a plan, but it's even more important if you plan to phase stuff in over time (which we may have to do depending on the cost of things). You want to think about the big picture before putting in the little picture stuff now so you don't have to tear stuff out (and waste money) in the future.

We've been working with the architect on finalizing the hardscape features (the most recent version below ["I notice more walls," noticed the builder]). We've also talked about the stage design for the back yard as well as planters.

We've discussed the sidewalk with the builder. We can put in a sidewalk per city code or write the city a ransom check (for twice the cost of putting in the sidewalk). I'm amenable to a sidewalk for the front of the house if we could get a "curb hugger" (a sidewalk that's up against the cube instead of set back two feet), but the builder said that the city will insist on the two foot setback (gives pedestrians more time to dodge careening vehicles, apparently...). A curb hugger, in my mind, would make it easier for passengers to get in and out street-parked cars and look less goofy than one house on our side of the street having a sidewalk.






ready for the runway?

The builder suggested that the architect ought to consider getting professional photographs made of the house when it's done. That's a good sign! And the architect has felt us out about being on a home tour at some point. Sign us up! We've appreciated the many good folks about Austin that have opened up their homes to us (and many, many others) in the past, so we're good to give back.

The neighbor has the best view of the house.


overall...

...things are going great! Little glitches here and there, sure, but the balance weights heavily-heavily o-so-heavily towards "Totally awesome, dude!" Lots to do, but it's all terribly exciting, and getting us closer to our move in.

FahrvergnĂĽgen in the back. FahrvergnĂĽgen in the front.