austin cubed: the misadventures of building a modern/contemporary/green home in austin, tejas
Pages
(Move to ...)
home
key pages
honeydos
chosens
time lapse
modern home history
modern mavens
links
$shots
contact
neighborhood resources
bucket list
austin blogs
art
austin architecture
▼
12.29.2021
cabin: framing one
›
The framing is starting to go in! The lower floor is framed (with the 3,000 gallon rainwater tank installed). By this time, the floor is she...
12.12.2021
cabin: foundation done!
›
The foundation is done! The concrete blocks have been laid, the concrete floors poured, and the pooperpumper installed. We were in Las Cru...
11.20.2021
grassing the pervious driveway
›
When we first installed the driveway, we seeded it with the Lady Bird mix. However, it just didn't take well with spindly Buffalo Grass...
foundation 5
›
The block is going in! Can get a sense of the view onto the National Forest off the back two sides of the property.
11.14.2021
foundation qua
›
Concrete block delivered and to be installed over the next couple of weeks.
11.07.2021
cabin: foundation twee
›
Footings poured! Can start to see what the views will be like with the cabin at an angle to the lot: trees, trees, trees!
10.31.2021
the coming scrape
›
The neighbors recently sold their house as a scrape and, indeed, the scrape approaches in early December. The small houses in our neighbor...
‹
›
Home
View web version